Planning permission types for building plots

Full, outline, reserved matters, permission in principle and lawful development certificates, and how to check the council decision notice.

Guidance checked on 16 November 2026. This is general guidance, not legal or tax advice.

"Plot with planning" can mean several different things. The type of permission decides how much design freedom you have, how much work is left before you can build and how long the permission lasts.

Full planning permission

Full permission approves a specific design: the layout, appearance, scale, access and landscaping shown on the approved plans. Unless the decision says otherwise, work must begin within three years of the decision date. If you want a different house, you will need a new application or a variation.

Outline permission and reserved matters

Outline permission establishes that some development is acceptable in principle, with some or all details left as "reserved matters": access, appearance, landscaping, layout and scale. Unless the decision says otherwise, reserved matters must be applied for within three years of the outline permission and work must start within two years of the final reserved matters approval. Outline permission gives more design freedom but more risk, because the council can still refuse the details.

Permission in principle

Permission in principle (PiP) covers location, land use and the amount of development, for minor housing schemes or sites on a council's brownfield land register. It is a first stage only: you cannot build until you also have technical details consent. A PiP granted on application lasts three years by default; one granted through the brownfield register lasts five years.

Lawful development certificates

A lawful development certificate confirms that an existing use or a proposed development is lawful. For plots it is often used to show that a permission was lawfully started before it expired, which keeps that permission alive.

Conditions

Most permissions come with conditions. Pre-commencement conditions, such as materials, drainage or a construction plan, must be discharged before work starts. Starting without discharging them can mean the work isn't lawful and the permission may not have been properly implemented.

How to check the council decision notice

Scotland

Scotland uses "planning permission in principle" and "approval of matters specified in conditions" instead of outline and reserved matters, with different time limits. Check with the planning authority.