Land with planning 53 Gills Cliff Road, Ventnor, Isle Of Wight, PO38 1AD
0.17 acres · Land · Freehold
Auction 5 Nov 2026
First seen 16 Nov 2026 · Last checked 17 Nov 2026
Photos by Clive Emson · checked 17 Nov 2026 · Original listing ↗
Clive Emson says it has planning permission — not yet confirmed
Get 4 documents from the agent before you offer.
Can I build here? Permitted Needs checking Problem Needs checking Checking…
Clive Emson says: “Two separate Planning Consents have been obtained (and commenced) for the construction of a single four bedroomed detached unit and a pair of detached units.” We haven’t seen the council decision.
Source: Clive Emson
Get the council’s decision 22/01725/FUL · Isle of Wight Planning details
Any warnings on official maps? Clear Needs checking Problem Needs checking Checking…
Checking flood, protected-land and mining maps at the map pin…
Ground and services Clear Needs checking Problem Needs checking Checking…
Checking water, power, radon and ground maps at the map pin…
Ready to offer? Ready Needs checking Under offer Needs checking Checking…
4 documents to get before you offer: the decision notice , the sale plan , the title plan and the services information .
Your indicative budget £87,994–£100,284
plus 10 items still to be quoted, such as Community Infrastructure Levy (CIL), Biodiversity net gain (BNG), Section 106 obligations.
See your budget
Looking up water, power, radon and ground records for this plot…
Start here 0 of 3 done
The 3 most urgent steps for this plot.
Get the documents from the agent Ask Clive Emson for the decision notice, the sale plan, the title plan and the services information.
Have a solicitor check the title and access They confirm who owns it and how you get in.
Bird & Co Property legal advice
Works across the UK Land and new-build work
Contact the team
Contact details from their website , checked 2026-10-05
Ask what services can connect Water, power and drainage can cost a lot to bring in.
Cable Connections Utility connections
Works across the UK
Contact the team
Contact details from their website , checked 2026-10-05
UK Power Connections Utility connections
Works across the UK
Contact the team
Contact details from their website , checked 2026-10-05
The full buying path 0 of 29 done
See the evidence
Details
Show on map
Find a planning consultant
Check details
Not checked
Clive Emson says: “Two separate Planning Consents have been obtained (and commenced) for the construction of a single four bedroomed detached unit and a pair of detached units.” We haven’t seen the council decision.
The planning reference
22/01725/FUL Copy
Full: The letters at the end suggest full permission: the design is approved, subject to the conditions on the decision notice.
20/00586/FUL Copy
Full: The letters at the end suggest full permission: the design is approved, subject to the conditions on the decision notice.
25/01485/CLPUD Copy
Not shown in the reference: The reference doesn’t show the type of permission. The decision notice will say.
23/00614/CLPUD Copy
Not shown in the reference: The reference doesn’t show the type of permission. The decision notice will say.
Council: Isle of Wight.
Other ways to get it
Find it on the council’s website
Open Isle of Wight planning ↗
Search for 22/01725/FUL . We copy it for you when you open the search. Open the Documents tab. Download the Decision Notice .
Ask Clive Emson for it Ask Clive Emson for it The council's official letter that grants (or refuses) planning permission, with the conditions attached.
What it is A short document from the council saying what was approved, the reference number, the date, and a numbered list of conditions. It goes with the approved drawings.
Where it comes from The council's online planning register (search by the reference), or ask the agent.
What to check The type of permission: full, outline, reserved matters or permission in principle. What exactly is approved: number of homes, size, position. The date, and the time limit for starting work. Every condition, especially those that must be met before work starts.
Red flags Outline permission only: the design still needs approving. The time limit has passed or is close. Conditions needing expensive reports or road works. The approved drawings don't match the land being sold.
What to say when you ask Please could you send me the planning decision notice and the approved drawings for this plot?
Ask Clive Emson for it
Sources A map from the seller showing exactly which land is for sale.
What it is A plan, usually with the plot outlined in red, attached to the sale particulars or the draft contract.
Where it comes from The selling agent or the seller's solicitor.
What to check It matches the land shown on the title plan. It includes the access to the road. It matches the land in the planning permission. The boundaries on the ground match the plan.
Red flags The sale plan and title plan don't match. The access road is outside the red line. Only part of the land with planning permission is being sold.
What to say when you ask Please could you send me the sale plan showing the exact boundaries of the land being sold?
Ask Clive Emson for it
Sources The official record of who owns the land and what rights and restrictions apply.
What it is The register lists the owner, rights over the land, restrictions (covenants) and mortgages. The title plan shows the general extent of the land.
Where it comes from HM Land Registry online, for land in England and Wales.
Cost A small fee per document from HM Land Registry (check the current fee on their site).
What to check The seller is the registered owner. Rights of way for you, and for others over the plot. Restrictive covenants, for example limits on what can be built. Overage or clawback, and any mortgage on the land.
Red flags The seller isn't the registered owner. A covenant that conflicts with the planning permission. No registered right of way to reach the plot. The land isn't registered at all.
What to say when you ask Please could you send me the title register and title plan, and tell me if any of the land is unregistered?
Ask Clive Emson for it
Sources What water, drainage, power, gas and broadband can reach the plot, and the cost of connecting.
What it is Details from the seller about nearby connections, plus budget quotes from each network company.
Where it comes from The selling agent first, then the water company, the electricity network operator and broadband providers.
What to check Where the nearest water main, sewer and electricity supply are. Whether connections cross land you don't own. Budget quotes for each connection.
Red flags No public sewer nearby: you may need a septic tank or treatment plant. Connections needing permission to cross a neighbour's land. A long distance to the electricity network.
What to say when you ask Please could you tell me which services are connected or nearby, and share any connection quotes or service plans you hold?
Ask Clive Emson for it
Sources What the government maps on plot.market show, and what they don't.
What it is We check published maps for flood zones, conservation areas, green belt, protected trees, wildlife sites, Article 4 areas and coal-mining risk.
Where it comes from Government and public bodies, linked on each result.
What to check Anything found at the map pin or across the outline. Whether the pin is in the right place.
Red flags Flood zone 2 or 3. A conservation area or Article 4 area: extra design rules. High-risk coal-mining area.
Sources Every cost between finding the plot and moving in.
What it is The plot, land tax, legal fees, surveys, planning and design fees, connections, the build, insurance, warranty and a contingency.
Where it comes from Quotes from each provider; this site never guesses build costs for you.
What to check A quote or estimate for every line. A contingency for surprises. When each payment falls due.
Red flags No allowance for connections or foundations. No contingency.
Sources How self-build mortgages and warranties work.
What it is Self-build mortgages release money in stages as the build progresses. Lenders usually require a structural warranty or professional supervision.
Where it comes from A mortgage broker who arranges self-build mortgages.
What to check Whether payments are released before or after each stage. What warranty or certificate the lender needs. Any extra rules for factory-built homes.
Red flags Assuming an ordinary mortgage will cover the build. No warranty arranged before building starts.
Sources A free council list of people who want to build their own home.
What it is Councils in England must keep a register and take it into account when planning for homes.
Where it comes from The local council's website.
What to check The local connection or other criteria the council uses.
Red flags
Sources How you would legally get on to the plot, by car and for building.
What it is Either the plot touches a public road maintained by the council (an "adopted" road), or there is a written legal right to cross someone else's land.
Where it comes from The title register, and the council's highways team for adopted roads.
What to check The plot touches an adopted road. Any private road has a written right of way, including for building traffic. Visibility splays the planning permission requires are on land you control.
Red flags A strip of land owned by someone else between the plot and the road. A right of way only "on foot". Planning conditions needing works on a neighbour's land.
Sources Finding out what the ground is like before you design the foundations.
What it is Desk checks (radon, coal mining, contamination maps) and, usually, a site investigation with trial holes.
Where it comes from Public maps, then a ground investigation company.
What to check Radon levels for the area. Past coal or other mining. Clay soil near trees, made ground or past industrial use.
Red flags Past mining or landfill nearby. Large trees close to where the house would go. Signs of filled ground or old buildings.
Sources Protected trees and wildlife can limit what you build and when.
What it is Tree surveys and protected species surveys, often done for the planning application.
Where it comes from The planning application documents, or an ecologist.
What to check Any Tree Preservation Orders. Ecology reports with the planning application. Conditions about wildlife or biodiversity.
Red flags Protected species found on or near the plot. Surveys that can only be repeated at certain times of year.
Sources The rules attached to a planning permission that you must follow.
What it is Numbered conditions on the decision notice. Some must be met before work starts ("pre-commencement"), some before you move in, and some last for ever.
Where it comes from The decision notice.
What to check Which conditions must be approved before work starts. Which need reports or surveys, and their likely cost. Anything about the road access, drainage, trees or materials.
Red flags Work started before pre-commencement conditions were approved: the permission may not be valid. Conditions that need land you aren't buying.
Sources A charge some councils make on new homes, which self-builders can usually avoid if they apply in time.
What it is The Community Infrastructure Levy is set by each council. Self-builders who will live in the home can claim an exemption.
Where it comes from The council's CIL pages and forms.
What to check Whether the council charges CIL. The forms needed and the order to send them. That the exemption is confirmed before work starts.
Red flags Starting any work before the exemption is confirmed. Selling or letting the home within the required period after completion.
Sources Stamp Duty Land Tax in England, Land Transaction Tax in Wales, Land and Buildings Transaction Tax in Scotland.
What it is A tax paid when you buy land, worked out from the price and your situation.
Where it comes from Your solicitor confirms the amount and files the return.
What to check The amount, before you offer. Who files the return and when.
Red flags Budgeting with a calculator that assumes you are buying a finished house.
Sources How to offer without committing before you are ready.
What it is A written offer to the agent, "subject to contract", listing any conditions such as satisfactory searches.
Where it comes from You, to the selling agent.
What to check Your offer says "subject to contract". You have proof of funds ready. You have a solicitor lined up.
Red flags Paying a non-refundable deposit before exchange. Pressure to skip searches or surveys.
Sources Checks your solicitor orders that reveal things not on the title.
What it is Local authority, water and drainage, environmental and, where relevant, mining searches.
Where it comes from Your solicitor orders them.
What to check Road schemes, planning history and enforcement. Drainage and water connections. Contamination, flooding and mining.
Red flags Enforcement notices or breaches on the land. Contamination risk.
Sources The two moments that make the purchase final.
What it is At exchange you become legally bound and pay a deposit. At completion you pay the rest and the land is yours.
Where it comes from Your solicitor handles both.
What to check Every check is finished before exchange. Insurance starts at completion.
Red flags Exchanging with checks still outstanding.
Sources Insurance for the land and the build from the day you own it.
What it is Self-build site insurance covering public liability, the works and materials.
Where it comes from Self-build insurance providers.
What to check It starts at completion. It covers the whole build period.
Red flags A gap between completion and the start of cover.
Sources Rules for safety, structure and energy, separate from planning.
What it is Approval of your plans and inspections during the build by building control.
Where it comes from The council's building control or a registered building control approver.
What to check Approval before work starts. Inspections booked at each stage.
Red flags Starting work without building regulations approval.
Sources Notice you may need to give neighbours before building on or near the boundary.
What it is The Party Wall etc. Act 1996 requires notice for some work on or near a shared boundary.
Where it comes from You or a party wall surveyor.
What to check Whether your work is covered by the Act. Notice periods.
Red flags Digging foundations close to a neighbour's building without notice.
Sources
Why it matters The listing tells you what the agent says. Only the council's decision notice tells you what you are allowed to build, and under which conditions.
How Get the council's decision notice and approved drawings. Check the type of permission, what it allows and when it runs out.
Who The council's planning register, or ask the agent.
Watch for Outline permission and "reserved matters" are not full permission on their own. Permission can also lapse if work hasn't started in time.
Read: The planning decision notice
Ask Clive Emson for it
Who can help Pegasus Group Planning advice
Works across the UK
Contact the team
Fytche-Taylor Planning Planning advice
Works across the UK
Contact the team
Done
Why it matters Flood zones, conservation areas, protected trees and wildlife sites can limit what you build or add cost.
How See the warnings on this page, then ask about anything found.
Who plot.market checks government maps at the map pin.
Watch for A map pin is a point, not the whole plot. Something just over the line may still affect you.
Read: Official map checks
Done
Why it matters The plot price is only the start. Stamp duty, legal fees, surveys, connections, the build and a contingency all add up.
How List every cost, get quotes for the big ones, and keep money aside for surprises.
Who You, with quotes from builders and specialists.
Watch for Connecting water, power and drainage to a bare plot can cost thousands. Get quotes early.
Read: Your all-in budget
Done
Why it matters Ordinary mortgages don't cover building a home. Self-build mortgages release money in stages and have their own conditions.
How Speak to a self-build mortgage broker before you offer. Ask what the lender needs, such as a structural warranty.
Who A mortgage broker who arranges self-build mortgages.
Watch for Many lenders want a structural warranty in place, and some have extra rules for factory-built homes.
Read: Paying for land and a self-build
Who can help
Done
Why it matters Councils must keep a register of people who want to build their own home. It's free and shows demand in the area.
How Search for the council's "self-build register" and fill in the form.
Who The local council.
Read: The self-build register
Done
Why it matters It shows exactly which land is for sale. Without it you can't be sure where the plot starts and ends.
How Ask the agent for the sale plan and compare it with the map and the title plan.
Who The selling agent or the seller's solicitor.
Read: The sale plan
Ask Clive Emson for it
Who can help BES Geomatics Land surveys
Works across the UK
Contact the team
AP Land Surveys Land surveys
Works across the UK
Contact the team
Contact details from their website , checked 2026-10-05
Done
Why it matters They show who owns the land, rights over it, restrictions (covenants) and any mortgage on it.
How Download them from HM Land Registry, or ask the agent. Have a solicitor read them.
Who HM Land Registry, then a property solicitor.
Watch for Some land isn't registered yet. Then the seller's solicitor must show the old deeds.
Read: The title register and title plan
Ask Clive Emson for it
Who can help Bird & Co Property legal advice
Works across the UK Land and new-build work
Contact the team
Contact details from their website , checked 2026-10-05
Done
Why it matters A plot that doesn't touch a public road directly may depend on someone else's land to reach it.
How Check the plot touches an adopted (council-maintained) road, or that a written right of way is on the title.
Who A property solicitor; the council's highways team for which roads are adopted.
Watch for A narrow strip owned by someone else between the plot and the road (a "ransom strip") can cost a lot to buy.
Read: Access and rights of way
Who can help Bird & Co Property legal advice
Works across the UK Land and new-build work
Contact the team
Contact details from their website , checked 2026-10-05
Done
Why it matters Water, sewer, electricity, gas and broadband may need new connections. Some plots need their own sewage treatment.
How Ask the agent what is connected nearby, then ask each network company for a budget quote.
Who The water company, the electricity network operator, and broadband providers.
Watch for If there is no public sewer, a septic tank or treatment plant must meet the Environment Agency's rules.
Read: Services information
Ask Clive Emson for it
Who can help Cable Connections Utility connections
Works across the UK
Contact the team
Contact details from their website , checked 2026-10-05
UK Power Connections Utility connections
Works across the UK
Contact the team
Contact details from their website , checked 2026-10-05
Done
Why it matters Soft ground, clay near trees, old mine workings or contamination can change your foundations and your budget.
How Ask for any ground reports. Check radon and coal-mining maps. Budget for a ground investigation.
Who A ground investigation company or structural engineer.
Read: Ground checks
Who can help Geosyntec Ground checks
Works across the UK
Contact the team
Ruddlesden Geotechnical Ground checks
Works across the UK
Contact the team
Contact details from their website , checked 2026-10-05
Done
Why it matters Protected trees and wildlife like bats or newts can limit what you build, and some surveys can only be done in certain months.
How Ask whether ecology or tree surveys were done for the planning permission, and what they found.
Who An ecologist or tree surveyor.
Watch for Some wildlife surveys can only be done at certain times of year, which can delay you by months.
Read: Trees and wildlife
Who can help Lee Ecology Ecology surveys
Works across the UK
Contact the team
Contact details from their website , checked 2026-10-05
Collington Winter Ecology surveys
Works across the UK
Contact the team
Contact details from their website , checked 2026-10-05
Done
Why it matters Conditions on the permission can require reports, approvals or works before you can start building.
How Read every condition on the decision notice. Note anything that must be done before work starts.
Who You, or a planning consultant.
Read: Planning conditions
Who can help Pegasus Group Planning advice
Works across the UK
Contact the team
Fytche-Taylor Planning Planning advice
Works across the UK
Contact the team
Done
Why it matters Some councils charge a levy on new homes. Self-builders can usually be exempt, but only if they apply before starting work.
How Check the council's CIL page. If it applies, plan the exemption forms now.
Who The council's CIL team.
Watch for Start work before the exemption is agreed and you can lose it and owe the full levy.
Read: The infrastructure levy (CIL) and the self-build exemption
Done
Why it matters Overage means paying the seller extra later, for example if you build more homes. Covenants can restrict what you build.
How Ask the agent directly, and have your solicitor check the title and draft contract.
Who A property solicitor.
Read: The title register and title plan
Who can help Bird & Co Property legal advice
Works across the UK Land and new-build work
Contact the team
Contact details from their website , checked 2026-10-05
Done
Why it matters You pay Stamp Duty Land Tax in England or Land Transaction Tax in Wales. How it applies to land depends on your situation.
How Ask your solicitor to confirm the amount before you offer.
Who Your solicitor, using HMRC or Welsh Revenue Authority rules.
Read: Tax on buying land
Done
Why it matters Nothing is binding until contracts are exchanged. Saying "subject to contract" keeps it that way.
How Email the agent your offer. Say what it is subject to, such as satisfactory searches or survey.
Who You, to the selling agent.
Read: Making an offer on land
Done
Why it matters Agents usually ask how you will pay before passing an offer on as serious.
How Get a mortgage agreement in principle or a bank statement ready to share.
Who Your bank or mortgage broker.
Read: Paying for land and a self-build
Done
Why it matters Land purchases have more to check than buying a house. A solicitor used to land and new builds helps.
How Get a quote that covers land, planning and title checks.
Who A property solicitor or licensed conveyancer.
Who can help Bird & Co Property legal advice
Works across the UK Land and new-build work
Contact the team
Contact details from their website , checked 2026-10-05
Done
Why it matters Searches reveal things not on the title, such as road plans, drainage, contamination and mining.
How Your solicitor orders local authority, water and drainage, environmental and (where relevant) mining searches.
Who Your solicitor.
Read: Property searches
Done
Why it matters Anything unclear about boundaries, access, rights or disputes should be answered in writing.
How Tell your solicitor everything you've found so far so they can ask about it.
Who Your solicitor, to the seller's solicitor.
Who can help Bird & Co Property legal advice
Works across the UK Land and new-build work
Contact the team
Contact details from their website , checked 2026-10-05
Done
Why it matters This is when you are legally committed. Pulling out after this usually means losing your deposit.
How Only exchange when every check is done. You pay a deposit, often 10%.
Who Your solicitor.
Read: Exchange and completion
Done
Why it matters You pay the rest and the land becomes yours. Your solicitor pays the land tax and registers you as owner.
How Your solicitor handles completion, the tax return and the Land Registry application.
Who Your solicitor.
Read: Exchange and completion
Done
Why it matters Bare land and building sites need cover for public liability and, once building starts, the works.
How Get self-build site insurance before completion or on the same day.
Who A self-build insurance provider.
Read: Site insurance
Done
Why it matters Starting work before these are approved can make the permission invalid.
How Apply to the council to approve the details each condition asks for. Allow weeks for decisions.
Who You or a planning consultant, to the council.
Read: Planning conditions
Who can help Pegasus Group Planning advice
Works across the UK
Contact the team
Fytche-Taylor Planning Planning advice
Works across the UK
Contact the team
Done
Why it matters This must be claimed and accepted before you start. Starting first can cost you the exemption.
How Send the council the required CIL forms, including the commencement notice, before work begins.
Who You, to the council's CIL team.
Read: The infrastructure levy (CIL) and the self-build exemption
Done
Why it matters Building regulations cover safety, structure and energy. They are separate from planning permission.
How Apply to the council's building control or a registered building control approver.
Who Building control.
Read: Building regulations
Who can help
Done
Why it matters Most lenders, and future buyers, want a 10-year structural warranty on a new home.
How Arrange it before building starts, as the warranty provider inspects during the build.
Who A structural warranty provider.
Read: Paying for land and a self-build
Who can help
Done
Why it matters Connections can take months to schedule.
How Accept quotes and book dates early.
Who Water, electricity and broadband network companies.
Who can help Cable Connections Utility connections
Works across the UK
Contact the team
Contact details from their website , checked 2026-10-05
UK Power Connections Utility connections
Works across the UK
Contact the team
Contact details from their website , checked 2026-10-05
Done
Why it matters Building on or near a boundary, or digging close to a neighbour's building, can require formal notice.
How Check whether the Party Wall Act applies and serve notices in time.
Who You or a party wall surveyor.
Read: Party wall notices
Who can help
Done
Pegasus Group Planning advice
Works across the UK
Contact the team
Fytche-Taylor Planning Planning advice
Works across the UK
Contact the team
ProHort Tree surveys
Works across the UK
Contact the team
Contact details from their website , checked 2026-10-05
EMEC Arboriculture Tree surveys
Works across the UK
Contact the team
Contact details from their website , checked 2026-10-05
Lee Ecology Ecology surveys
Works across the UK
Contact the team
Contact details from their website , checked 2026-10-05
Collington Winter Ecology surveys
Works across the UK
Contact the team
Contact details from their website , checked 2026-10-05
Unda Consulting Flood and drainage
Works across the UK
Contact the team
Contact details from their website , checked 2026-10-05
RIDA Reports Flood and drainage
Works across the UK
Contact the team
Contact details from their website , checked 2026-10-05
Geosyntec Ground checks
Works across the UK
Contact the team
Ruddlesden Geotechnical Ground checks
Works across the UK
Contact the team
Contact details from their website , checked 2026-10-05
Get quotes for building a home on this plot Tell matched home builders what you have in mind. They'll contact you directly.
Agent’s description Category
Land with Planning
Tenure
Freehold
This south-facing freehold site is situated in the southern part of the Isle of Wight, close to the centre of the popular seaside town of Ventnor. The site extends to an approximate total of 0.07 hectares (0.17 acres), enjoys stunning sea views over the English Channel and backs onto downland.
Planning
Planning Permission has been granted by Isle of Wight Council under reference 22/01725/FUL, for the construction of the single detached dwelling, and Planning Permission has been granted by Isle of Wight Council under reference 20/00586/FUL, for the construction of the pair of detached dwellings, subject to conditions. Commencement approvals are under references 25/01485/CLPUD and 23/00614/CLPUD, respectively.
A copy of the Planning Permissions and accompanying documents may be downloaded from the Isle of Wight Council website: iow.gov.uk. Tel: 01983 823552.
Site Measurements
The site extends to 0.07 hectares (0.17 acres).
Freehold with Vacant Possession
53 Gills Cliff Road, Ventnor, Isle Of Wight
Are you the agent? Claim this listing · Ask us to remove it